ROUGH DRAFT PROJECT SCHEDULE AND ACTIVITY LIST
May April May June July August September October November
PROJECT - ACTIVITY 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27
Tree Trimming:
Tree Inspection As needed
Roadside Trimming As needed
Branch Chipping  
STORMWATER:
Catch Basin Cleaning   As needed  
Curb Sweeping      
Ditch Cleaning   As needed  
Storm Pipe Jetting As needed
MOWING:
Cemetery Preparation  
Roadside Mowing  
PAVEMENT:
Cold Patching  
Crack Sealing  
Hot Asphalt Paving  
Concrete Paving  
Vendor Paving  
SIGNS AND STRIPE:
Road Stripe  
Sign Replacement As needed
Note: Construction projects are scheduled in open time periods when manpower and equipment are available.